Select a language:

Laguna Canyon Channel Replacement Project

BACKGROUND

Laguna Canyon Channel Replacement Project | 2019 Storm Channel Wall Failure

During heavy storms in February 2019, approximately 265 feet of the channel wall closest to Laguna Canyon Road collapsed. An investigation determined that an emergency repair was needed to maintain flood protection to the community. In March 2019, a temporary repair was implemented to fix the collapsed wall and bracing was added to prevent additional failures. The project will replace the temporary repairs with a permanent solution for the channel.

Project Scope

The Laguna Canyon Channel Replacement Project, between Laguna Canyon Frontage Road and Woodland Drive, consists of removing and replacing the rectangular concrete channel, reinforced concrete box pedestrian crossings, softscape and hardscape that may be damaged and/or removed in order to construct the project, and removal of trees adjacent to the project limits that pose a risk to the channel.

 

Location

Click on image below to download PDF.

Laguna Canyon Channel Replacement Project Map

Status

Design/Concept

(Anticipated construction start date is after the 2022 Sawdust Art Festival.)


Updates


Meetings

City of Laguna Beach Planning Commission (Public Hearing)

Wed., May 18, 2022 at 6 p.m.

picture_as_pdf Agenda /Documents

smart_display Join the meeting online...


City of Laguna Beach Planning Commission (OCPW Presentation)

Wed., August 4, 2021 at 6 p.m.
picture_as_pdf Event Flyer
smart_display City of Laguna Beach Live Stream Recording


Project Contact

Austin Morgan, P.E. 
phone (714) 647-3981  
emailProjectInfo@ocpw.ocgov.com


Social

Facebook
Twitter
Instagram