Project BackgroundOC Public Works will remove and replace four bridges, with three located in Silverado Canyon and one in Modjeska Canyon. The bridges planned for replacement are 2-lane steel bridges built in the 1930s and 1940s. The new bridges are designed to enhance safety and access for residents and area motorists by bringing the structures up to current design standards. |
![]() |
|||
Project InformationThe four replacement bridges will be precast voided concrete slabs, single span bridges. In addition to constructing new bridge structures, the existing abutment will be completely removed and replaced. The bridge located near Ladd Canyon Road will be the first of the four bridges to be removed and replaced. OC Public Works will host community outreach meetings to present the preliminary bridge design options to the community and to solicit feedback. |
||||
|
|
LOCATION |
DETAIL |
COMMUNITY |
ANTICIPATED CONSTRUCTION START* |
|
1 |
Project Map | Ladd Canyon Bridge near Ladd Canyon Road | October 2019 | 2021 |
|
2 |
" | West of Silverado Community Center | Spring 2020 | 2021/2022 |
|
3 |
" | Midway between OC Fire Authority Station 14 and Belha Way | Spring 2020 | 2021/2022 |
|
4 |
" |
Markuson Road and Shadowland Circle | Spring 2020 |
2021/2022 |
| *The anticipated construction start date is tentative and is subject to change. | ||||
Project Process
|
||||
Project EventsWHAT: Community Meeting: Ladd Canyon Bridge WHEN: October 29, 2019 |
||||
Project SurveyWe want to hear from you! Take our brief online survey to select your preferred bridge railing design option. Take the survey. |
||||
Email UpdatesWant to stay informed as we moved things along? Sign-up to receive email updates. |
||||